top of page
home.jpg

OUR BACKGROUND

How We Got Here

With all of our batch treatments we are constantly testing and evaluating to make sure we optimize your well to its fullest potential.

​

One group of wells in Ochiltree County was being hot oiled multiple times per month.  Cross Heat was able to design a batch treatment program that eliminated hot oil and wells have experience zero failure in over 26 months.  They also have maintained a 15% increase in oil production.

​

On another group of wells in Lipscomb County, Cross Heat developed a batch treatment program that resulted in a 35% increase in oil production and a 10% increase in gas production while experiencing no failures.

​

A project in Hartley County Tx has eliminated hot oiling backsides on a twice monthly basis and has eliminated the need for tank treating with a bi weekly batch treatment.

bottom of page