top of page

Paraffin Batch Treatments

With all of our batch treatments we are constantly testing and evaluating to make sure we optimize your well to its fullest potential.

​

One group of wells in Ochiltree County was being hot oiled multiple times per month.  Cross Heat was able to design a batch treatment program that eliminated hot oil and wells have experience zero failure in over 26 months.  They also have maintained a 15% increase in oil production.

​

On another group of wells in Lipscomb County, Cross Heat developed a batch treatment program that resulted in a 35% increase in oil production and a 10% increase in gas production while experiencing no failures.

​

A project in Hartley County Tx has eliminated hot oiling backsides on a twice monthly basis and has eliminated the need for tank treating with a bi weekly batch treatment.

bottom of page